Dunwoody, GA - Thursday February 24, 2022

Postponed

Dunwoody, GA

Event Date
Thursday February 24, 2022

7:30 am - 5:30 pm

Available Credits

Up to 8 AIA HSW/LU CE Hour(s)
Maggiano's Little Italy
4400 Ashford Dunwoody Rd.
Dunwoody, GA 30346
no registration link
Registration Price

$65.00

Terms
Early Bird Discount! $30.00 off if purchased before Feb 10, 2022

JOIN US IN YOUR CITY • REGISTER BELOW • ATTENDANCE REPORTED ON A PER-PRESENTATION BASIS

Event Agenda

Thursday, February 24, 2022

7:30 am

8:00 am

Designing Safe and Durable Buildings with Architectural Standing Seam Metal Roofing
Sponsored By NB Handy
1 AIA HSW/LU CE Hour(s)

Precision manufacturing and quality installation have revolutionized the commercial metal roofing industry by combining lasting beauty with low maintenance. Join us in this one-hour course as we discuss architectural metals and current processing methods that promote efficiency when designing and installing roofs.

Learning Objectives:
  1. Discuss the evolution of architectural metals and current processing methods that are used to promote efficiency in design, safety, and installation
  2. Identify the environmental benefits of jobsite roof system fabrication and how it reduces packaging and product waste and increases weathertight warranties
  3. Describe testing and standards for architectural standing seam metal roof panel systems that ensure a roof will withstand standard loads, strong winds, and other issues relating to structural integrity and occupant safety
  4. Illustrate the many design options available when using architectural metals in a variety of markets and applications
NB Handy

9:10 am

Preventing Floorcovering Failures Through Integrated Design
1 AIA HSW/LU CE Hour(s)

Finish elements such as the floorcovering system have a great impact on the final aesthetics of a structure. Floorcovering specification sections often do not address the compatibility of the floorcovering system with the type of application and intended service use.

Learning Objectives:
  1. Identify the documents that clearly define proper installation of the floorcovering system.
  2. Recognize the impact of misspecification of floorcovering systems.
  3. Evaluate the impact of improper floorcovering systems installation.
  4. Specify appropriate ambient site conditions to avoid floorcovering system installation failure.
  5. Avoid floorcovering systems failures through improper/outdated design specifications.
ISE Logik Industries

10:20 am

Why Did the Waterproofing Fail?
Sponsored By Noble Company
Presented By Dean Moilanen
1 AIA HSW/LU CE Hour(s)
1 GBCI General Hour

This course evaluates the reasons that lead to failures of waterproofing installations. It examines product attributes that lead to successful installations and identifies the ways to identify necessary characteristics. Also compares installation methods and identifies ways to specify successful installations.

Learning Objectives:
  1. Review common waterproofing products, installation methods, and building code compliance.
  2. Understand the relationship of movement in the surface and substrate to waterproofing.
  3. Understand reasons for failures in waterproofing installations under tile and the relationship of failed waterproofing to durability and Sustainable Design.
  4. Understand permeation and its impact on creating suitable water and vapor barriers for tile installations and the relationship of permeation to Indoor Air Quality.
Noble Company

11:30 am

12:30 pm

1:00 pm

2:10 pm

3:20 pm

4:30 pm

no registration link
COVID-19 Protocols

Just like you, we are excited for the opportunity to resume live events. That being said, the health and safety of our attendees and presenters is our prime concern so, in addition to specific venue infection prevention procedures, we are doing the following:

  • Requiring that any presenter or attendee with any COVID-19 symptoms not attend the event (full refunds given, no matter how late the notice)
  • Working with venues to allow for social distancing while seated at the event
  • Providing hand sanitizer at the entrance to the presentation space
  • Following best practices for food distribution at the event
  • Monitoring and following local guidelines/mandates for infection prevention

State CE Requirements

Georgia CE Requirements

Professional Licensing Boards Division
(478) 207-2440
Renewal Cycle: 
Biennial
Total Hours Required: 
24
Detailed Hours Required: 
16 HSW
Renewal Deadline: 
June 30, odd years